A fast-paced design-and-build delivery for an automotive facility. Delivered under tight schedules with strong coordination across design detail, procurement challenges, and site conditions.
Factory25,000 m²
Automotive
On schedule
Production facilities
Żory, Poland
25,000 m²
Automotive
On schedule
Production facilities
Żory, Poland
Planning
Planning focused on securing the right location for the new factory and building a delivery plan around tight milestones. Procurement also required early attention due to limited material availability in parts of Europe– so lead times wouldn’t slow the schedule once works began.
Location selection support
We helped identify a suitable location to build the factory.
Procurement risk planned early
We planned around material availability constraints to protect the schedule.
Tight, phased scheduling
We structured the timeline by building areas to keep delivery controlled and trackable.
Designing
Design was developed under very tight timelines, with details aligned to the client’s requirements and checks. The focus was on producing clear, build-ready outputs quickly– without losing accuracy or operational fit.
Client-aligned detailing
We developed the design in line with detailed requirements reviewed and checked by the client.
Speed with discipline
We maintained design quality while working under a fast delivery tempo.
Build-ready outputs
We translated requirements into practical design decisions that supported execution.
Building
Works were executed in extreme weather conditions while maintaining a high standard of health and safety. Site coordination stayed focused on keeping progress steady and controlled under challenging conditions.
All-weather delivery
We maintained progress despite demanding weather conditions.
Safety maintained throughout
We protected health and safety standards across all site activities.
Controlled site coordination
We kept execution organised to protect milestones and quality.
Maintaining
Maintenance programmes and training were prepared for the client’s team to support reliable operation and consistent upkeep after delivery.
Maintenance programmes
We prepared a structured post-handover maintenance approach.
Client team training
We trained the client’s team to support safe, consistent upkeep.
Operational readiness support
We aligned handover inputs to support long-term performance.
Quotes from Project Manager
“High expectations, tight timelines, harsh weather– still delivered with discipline and quality. Proud to be part of such an interesting project.”
— Project Manager, GFS Engineering