Notebook production facility
A manufacturing build delivered under tight scheduling and challenging ground conditions. Planned to meet funding requirements while maintaining strong safety standards on site.
Factory5,000 m²
Paper products
On schedule
Production facilities
Chorzów, Poland
5,000 m²
Paper products
On schedule
Production facilities
Chorzów, Poland
Planning
Planning followed the requirements linked to EU funding and was built around a tight schedule divided into clear phases for each part of the facility. This structure helped keep decisions, documentation, and delivery aligned from the start.
EU funding requirements
We planned the project to meet the requirements connected to EU funds.
Tight, phased scheduling
We divided the schedule by building phases to keep delivery controlled and trackable.
Delivery alignment
We aligned planning inputs early to support smooth execution later.
Designing
Design work focused on challenging ground conditions, including high levels of soil pollution. The aim was to adapt the solution to site realities early, so execution could remain controlled and predictable once construction started.
Ground-condition challenge
We addressed high soil pollution levels as a key design constraint.
Site realities built in
We adapted design decisions to match real conditions on the ground.
Execution-ready approach
We aligned solutions early to reduce avoidable changes during delivery.
Building
Works progressed through demanding soil and weather conditions while maintaining a high health and safety standard. Site coordination stayed focused on keeping progress steady without compromising quality.
Challenging ground and weather
We maintained progress despite difficult soil and weather conditions.
Safety maintained throughout
We protected a high standard of health and safety across all site activities.
Controlled site delivery
We kept execution organised to protect milestones and quality.
Maintaining
Maintenance programmes and training were prepared for the client’s team to support reliable operation and consistent upkeep after delivery.
Maintenance programmes
We prepared a structured post-handover maintenance approach.
Client team training
We trained the client’s team to support safe, consistent upkeep.
Operational readiness support
We aligned handover inputs to support long-term performance.
Planning
Designing
Building
Maintaining
Planning followed the requirements linked to EU funding and was built around a tight schedule divided into clear phases for each part of the facility. This structure helped keep decisions, documentation, and delivery aligned from the start.
Design work focused on challenging ground conditions, including high levels of soil pollution. The aim was to adapt the solution to site realities early, so execution could remain controlled and predictable once construction started.
Works progressed through demanding soil and weather conditions while maintaining a high health and safety standard. Site coordination stayed focused on keeping progress steady without compromising quality.
Maintenance programmes and training were prepared for the client’s team to support reliable operation and consistent upkeep after delivery.
EU funding requirements
We planned the project to meet the requirements connected to EU funds.
Tight, phased scheduling
We divided the schedule by building phases to keep delivery controlled and trackable.
Delivery alignment
We aligned planning inputs early to support smooth execution later.
Ground-condition challenge
We addressed high soil pollution levels as a key design constraint.
Site realities built in
We adapted design decisions to match real conditions on the ground.
Execution-ready approach
We aligned solutions early to reduce avoidable changes during delivery.
Challenging ground and weather
We maintained progress despite difficult soil and weather conditions.
Safety maintained throughout
We protected a high standard of health and safety across all site activities.
Controlled site delivery
We kept execution organised to protect milestones and quality.
Maintenance programmes
We prepared a structured post-handover maintenance approach.
Client team training
We trained the client’s team to support safe, consistent upkeep.
Operational readiness support
We aligned handover inputs to support long-term performance.
Quotes from Project Manager
“A tight schedule under EU funding rules, on difficult ground. Proud of the discipline and focus the team kept throughout.”
— Project Manager, GFS Engineering